Dendrobium Coal Mine
Wollongong,
Australia
This chamber in the coal mine located about 1 hours drive south of Sydney, was constructed fast and efficiently using a range of PERI formwork and scaffolding.
-
Location
Main Application
Civil Engineering
The Project
Impressions from the project process
PERI TRIO & CB240 plus special formwork for acrched soffit.
TRIO and CB240 used to safely construct the walls.
ST 100 pre-assembled and lifted into position using the crane.
ST 100 shoring 12m high with CB and TRIO edge protection.
PERI Rundflex 7.2m high.
PERI TRIO & CB240 plus special formwork for acrched soffit.
TRIO and CB240 used to safely construct the walls.
ST 100 pre-assembled and lifted into position using the crane.
ST 100 shoring 12m high with CB and TRIO edge protection.
PERI Rundflex 7.2m high.
Are you working on a project like this?
Contact us – we will be happy to help you.