The DUO system formwork was used for one side of the wing wall 18 meters long and Trio for other 3 walls and parapet.

Moorabbin Culvert and Wing Wall
Moorabbin, Victoria, Australia

  • 3 metre high walls were formed at one end tapering down to 1350mm over the length of the wall
  • Walls were 300mm thick
  • TRIO was used for the other 3 walls and the Parapet

 

 

Main Application
Water Retaining Structures
Project participants
Customer: Prestige Civil

The Project

Impressions from the project process
Rod Wilkins
Rod Wilkins
Rod Wilkins
Director
All at Prestige Civil were very impressed with the result that the formwork achieved. Lightweight and durability was a major advantage allowing quick set up and strip out. For any pour up to 2.7 m high, I would definitely use the DUO system on future projects.

Related Products

##salesContact.expertImageAltLabel## Are you working on a project like this?

Contact us – we will be happy to help you.
The DUO system formwork was used for one side of the wing wall 18 meters long and Trio for other 3 walls and parapet.
The DUO system formwork was used for one side of the wing wall 18 meters long and Trio for other 3 walls and parapet.