Pibara,
Australia
- Retaining Walls and Duct Pit Walls approx 250linear meters. Walls ranged in height from 1m –3.6m
- Duration 8 weeks
The Project
Impressions from the project process
DUO standard panels are used where possible; The inclined conventional formwork was generated by skilled formwork carpenters on site.
Push-pull props and kickers are mounted
in order to align the formwork as well as providing stability and resistance against wind loads.
DUO Brackets and guardrail posts together with supplementary timber construction are used to build safe working platforms and access.
DUO is particularly suitable for small-sized applications in civil engineering where only Class 3 Finish is required.
DUO’s versatility was used as edge protection to prevent falls from heights on a suspended slab with a working height of 5.2m.
It is light weight made erecting safe and fast.
DUO standard panels are used where possible; The inclined conventional formwork was generated by skilled formwork carpenters on site.
Push-pull props and kickers are mounted
in order to align the formwork as well as providing stability and resistance against wind loads.
DUO Brackets and guardrail posts together with supplementary timber construction are used to build safe working platforms and access.
DUO is particularly suitable for small-sized applications in civil engineering where only Class 3 Finish is required.
DUO’s versatility was used as edge protection to prevent falls from heights on a suspended slab with a working height of 5.2m.
It is light weight made erecting safe and fast.
Declan White
Managing Director
PERI DUO is an environmentally friendly, lightweight formwork system by means of which we were able to increase our productivity. It offers numerous advantages: the low weight reduces crane costs and the users’ risk of injury. The easy assembly results in enhanced efficiency and ensures a better construction site result
Are you working on a project like this?
Contact us – we will be happy to help you.